It's already the end of February? I know it's a short month, but I don't know if 3 more days would make it seem any slower... It's time to check in with The List , my annual goal setting and focus-inducing effort.
It seems the theme of February, was variety! January was a great month quilting wise and while I've kept up some of the momentum in February, I worked on a huge range of different projects, and only finished one quilt. But, I also started a new job as a preschool teacher and managed to troubleshoot and (hopefully) fix my machine.
Finished Quilts of 2011
I finished the cute Girly I Spy this month, bringing my total finished for the year to date up to 5.
I finished one project from this list (yay!), added 2 (whoops!), and moved 2 projects off the design burner to here... which both got a lot of my attention and are almost finished quilts.
On the design burner (fabric has been pulled or cut, but no sewing has been done):
I would like to practice my FMQ more. I talked to some quilters who keep a scrap sandwich by their machine, so they can practice different motifs whenever time allows. I like this idea, but I think I'll keep a mini quilt on hand for this purpose.
Stash
OK, just a few irresistible thrift store finds, some Katie Jump Rope off of Etsy for the Soup Dragon (I had to have the yellow posies and then 2 other favorite prints came along for the party), and a wool scrap bundle to celebrate my new job.
The next goal: a quilt-a-thon in March... tops be gone!
It seems the theme of February, was variety! January was a great month quilting wise and while I've kept up some of the momentum in February, I worked on a huge range of different projects, and only finished one quilt. But, I also started a new job as a preschool teacher and managed to troubleshoot and (hopefully) fix my machine.
Finished Quilts of 2011
I finished the cute Girly I Spy this month, bringing my total finished for the year to date up to 5.
- Christmas Tree Mini Quilts done 1/11
- Baby quilt: spring strings (top done 3/10), basted 8/10, done 1/11
- Bloom Mini Quilt done 1/11
- 3 Quilted Book Covers started and done 1/11
- Girly I Spy Quilt done 2/11
I finished one project from this list (yay!), added 2 (whoops!), and moved 2 projects off the design burner to here... which both got a lot of my attention and are almost finished quilts.
- Stars & Strings tabletopper (started 2009) top done 7/10, basted,hand-quilting in progress*
- Houses Donation quilt top done 8/10
- Bright Snowballs (started 2009, top done)
- Applique Flowers Wall Quilt top done 8/10
- Indian Summer top done 12/10
- Gypsy Madness Leaders & Enders top done 1/11
- Wedding Ring Table Runner top done, quilted 10/10
- Amish-ish Mini Quilt* top done & basted 2/11
- Boy blocks baby quilt top done 2/11*
- Grey baby quilt * top done 2/11
- Stash Busting Bee International Log Cabin
- Say Cheese Self-Portrait
- Seasons Mat for R's preschool
- Crumb Blocks-->stars*
- Pinwheel Quilt
- Holy Night
- Soup Dragon*
- Yellow & Orange Log Cabins*
- Rainbow String Quilt*
- Scrappy Sixteens*
On the design burner (fabric has been pulled or cut, but no sewing has been done):
- Bricks & stones baby quilt
- Girl blocks baby quilt
- 2233 Pineapple
- Bento Boxes for S
- Leopard Roses
- Christmas quilts
- Donation quilt for A's school auction
- Retro Rail Fence
I would like to practice my FMQ more. I talked to some quilters who keep a scrap sandwich by their machine, so they can practice different motifs whenever time allows. I like this idea, but I think I'll keep a mini quilt on hand for this purpose.
Stash
OK, just a few irresistible thrift store finds, some Katie Jump Rope off of Etsy for the Soup Dragon (I had to have the yellow posies and then 2 other favorite prints came along for the party), and a wool scrap bundle to celebrate my new job.
The next goal: a quilt-a-thon in March... tops be gone!